Speed Up the EV Charger Installation Process

Condoit can reduce the time to from site walk to final stamp from six weeks to six days by automating and digitizing the process.

Site Walk

Step-by-step instructions
Perform for site walks
Pre-define checklist items
Complete in less than an hour
No experience needed
Assign to clients or employees
Export or share
Add to As-Built for build out

As-Built

Select from industry standard equipment
Input details for existing electrical infastructure
Connect equipment with digital raceways
Condoit auto-creates a digital single line diagram
Export reports or diagrams
Condoit conducts an automated load analysis

Design

Pre-loaded specs from manufacturer data sheets
Auto-sized conductors, breakers, and raceways
Export permit sets
Export bill of materials
Connect with an Engineer for help within the app - design, review, and stamp

All features of the Condoit platform are available across every solution.

Battle-tested in the field with regular enhancements suggested by your peers.

Features

share with collaborators
create site walk reports
add notes & photos tagged by location
flag maintenance & code issues
export configurable reports
standardize data input
automate panel scheduling
conduct EV readiness assessment
create digital single line diagram
access to Condoit support
Condoit iPad app

Ditch the Paper Drawing & Pen Mark Ups

Reduce permitting time by 50% using the Condoit platform.

See How It Works!
Try Condoit for FREE Today
Google Play linkApple App Store download

Ready to Get Started?

To learn more about Condoit, give us a call, take a self-guided product tour, or book a demo today!